Showcase:
Scherger RAAF Base
The client
Scherger is a Department of Defence base in northern Australia. It is located 26km east of Weipa in a remote area where mains electricity is not available.
Contract requirements
T.S.F. was selected in March 1995 to equip a purpose built underground building as a power station for the base. The installation needed to be suitable for both light load conditions, (during periods when the base was not active) as well provide a highly reliable power source for a demanding range of facilities when the base became fully operational.
Why T.S.F.?
- Proven expertise in delivery and installing equipment most appropriate to the required function
- Comprehensive testing of all equipment both before installation and after when integrated with other site services
- Able to offer a choice of engines and other equipment
- Ongoing maintenance provided after contract completion
- Proven ability to on remote isolated project sites
- Third party Quality Management System AS/NZS ISO 9001 accreditation by BSI Benchmark Certification since 1998
- Third party OHS Management System AS/NZS 4801 and Environmental Management Systems AS/NZS ISO 14001 accreditation by BSI Benchmark Certification since 2006
Supplied by T.S.F. Engineering
T.S.F. supplied and installed
- 2 x 500 KW Generator sets 2 x 300 KW Generator sets 2 x 150 KW Generator sets
- Hall 1 and Hall2 Genset main switchboards
- Control room switchboards with OMRON PLC's
- 486 PC for Wizcon SCADA, printer and modem
- Powerline carrier system and paging system
- 5 cubicle high voltage 11 KV switch board and 2 x 1500 KVA transformers
- 2 x 55,00litre underground tanks, piping and pumps
- Supply of mechanical and electrical spare parts
- Comprehensive operation and maintenance manuals
The work included installation of switchboards and cabling, transformers underground fuel storage and a substantial ventilation system for the underground building.